• Facilitating coordination among Group I stakeholders, including project members, contractors, and domain-specific managers, to ensure the successful delivery of projects. • Assisting key project participants by assuming their primary functions and responsibilities while monitoring outstanding issues. • Overseeing the fulfillment of contractor obligations as per contract terms and managing consortium operations. • Arranging consortium committee meetings and regular project directorate sessions. • Monitoring project advancement, liaising with stakeholders regarding project phase completion or delays, scheduling meetings, and maintaining project documentation and reports. • Developing and delivering pertinent and impactful communications for project stakeholders. • Supporting consortium project teams in maintaining resilience post-setbacks and recovering performance. • Managing and reporting project-level risks, offering timely recommendations to maximize value. • Adapting to changes necessary to balance execution efficiency with risk mitigation, value delivery, cost, quality, and benefits. • Compiling project delivery programs and plans, regularly providing project reports conveying cost and schedule data. • Expediting all procurement activities related to consortium partners, encompassing TBE, equipment definition, expediting, ITP and QA/QC, manufacturing, shipment, service works, commissioning, start-up, etc. • Coordinating Engineering and Procurement activities with major Vendors.

Project Control Manager, 07.2021 – 12.2021

• Providing support to the project team in achieving project objectives within designated targets, budgetary constraints, and quality standards. • Identifying, escalating, and managing any issues that may present contractual or commercial risks. • Assisting in the technical and financial management of the project, ensuring compliance with corporate and business policies, directives, guidance, and procedures. • Monitoring and reporting on program performance, technical quality, financial metrics, and KPIs, advising the Project Manager on necessary mitigation actions to prevent deviations from targets, and overseeing the change control process. • Facilitating communication, coordination, and information exchange with the client, project team, subcontractors, and partners (both internal and external). • Organizing and supervising the activities of the project control team. • Implementing document management and control processes to ensure accuracy and compliance. • Maintaining time and cost trend performance indicators and statistics. • Analyzing and interpreting schedule and cost data to alert management to control actions in a timely manner. • Assisting in invoicing and effective credit control to optimize cash flow, comparing revenue with anticipated costs, and identifying risk allowances, margins, and provisions during project initiation and monthly thereafter, including Earned Value reporting. • Proficiency in Scope Definition papers, Project Execution Plans, Risk Registers, Change Control Logs, and Client & Stakeholder Management plans.

Participated in the following projects:Engineering Procurement and Construction Contract of a copper concentrating plant (MOF-3) complex in the city of Almalyk, Republic of Uzbekistan - $2 blnCoordination of engineering and procurement activities with major Vendors of main process equipment:- Metso – $120 mln - flotation, filtration, thickening, filtering;- FLSmidth - $78 mln -conveyors, HPGR;- WEIR Minerals - $56 mln – Hydrocyclone Units and Pumps (biggest in the world);- Intertech - $16 mln - Gravity concentratorsEngineering Procurement and Construction Contract of a copper concentrating plant (MOF-4) - $2 bln. – expansion of Almalyk field – developing of Technical initial data List, blocks of areas for tenders, Contract Annexes and Procedures

Head of Surface Facilities Unit, Surface Facilities Reconstruction and Modernization Department

JSC “Ukrgazvydobuvannya”, NAFTOGAZ Group

Энергетика и Энергоносители

4 месяца

03.2021 - 07.2021

• Preparation of tender documents and engagement in pre-contract negotiation activities, including reviewing contract procedures and providing support, as well as selecting primary process equipment and developing technical requirements. Expert assessment of technical and commercial proposals and oversight of design and installation/construction works for various components such as gas treatment units, absorption/adsorption units for gas dehydration, heat exchangers, gas air coolers, compressor units, refrigeration units, and others.• Coordinating design assignments and establishing technical criteria for bidder qualification.• Managing procurement activities and providing support for the development of Design and Estimation Documentation, as well as overseeing EPC works for ongoing and future projects related to surface facilities modernization and reconstruction.• Supervising critical facilities and ensuring adherence to project schedules.• Coordinating maintenance and repair activities for compressor units and primary process equipment by both third-party contractors and in-house personnel.• Liaising with branches and affiliated departments.• Conducting negotiations pertaining to contractual activities.• Monitoring and supervising all organizational activities related to surface facilities and ground systems for gas collection, preparation, and transportation, including low-temperature separation units (LTS), propane refrigeration units, and Booster Compressor Stations (BCS) across various project stages (Pre-FEED, FEED, DD).Participated in the following projects:Oversaw the implementation of the “Gas Exploration Performance Plan” 2021-2022, which included 32 low-temperature separation units (LTS) and propane refrigeration units (PHU), UAOG, and 5 Booster compressor stations (BCS) at various stages (Pre-FEED, FEED, DD).

Project Engineer, Piping and Process Engineer, Interface Coordinator

LUKOIL Uzbekistan Operating Company

Энергетика и Энергоносители

7 лет 2 месяца

10.2012 - 12.2019

• Oversee design and ensure overall quality control of the project, conducting peer reviews including 3D model, constructability, and plot plan reviews. Provide engineering support to construction site teams for timely resolution of technical issues using a site query system, and manage a formal As-built program. • Manage supplier and fabricator involvement during design, equipment packaging, and modularization monitoring. Facilitate interface management between discipline engineers, document control, and business support functions (project controls, procurement & contracts, construction, quality, HSE, regulatory, etc.) and contractors regarding technical design issues. • Develop and control initial data, specifications, and approvals for design and survey works on process discipline. Establish technical requirements for design and survey works preparation and approval, and participate in the development of pre-qualification requirements and tender conditions for design and survey works contractor selection. Prepare contract drafts, participate in expert committees for qualification assessment, and prepare design estimates and specifications for process design. • Conduct incoming inspections to ensure compliance with technical requirements, specifications, and regulations. Supervise and approve design documents in accordance with applicable legislation and monitor imposed changes in design regulations and legislation. Organize field production control to ensure industrial safety, safety arrangements, and environmental protection throughout all design stages. • Manage subcontractors, conduct contract negotiations, and oversee pre-action activities. Provide mentorship and coaching for LUKOIL's young professionals and graduate students. • As a Piping Engineer, review conceptual and detailed designs of other departments, ensuring compliance with maintenance requirements, piping design codes, standards, and specifications. Perform piping flexibility and stress analyses in accordance with ASME codes and local regulations. Coordinate with procurement, engineering, store, and subcontractors on piping issues. • As a Process Engineer, prepare technical requirements for project development in process and piping specialties. Prepare pre-qualification requirements and tender conditions for design and survey work contractor selection. Participate in technical meetings with design companies, control modern process and construction solutions, and evaluate equipment usage in projects. Analyze process design changes in accordance with regulations and legislation.LUOC Projects and achievement10.15 - 12.17 - Gissar Field and Gas Plant development ($1bln), sites of UKPG, UPPG, 5 GSP, Development of Gas-Condensate Fields Adamtash, Gumbulak and Djarkuduk-Yangi Kizilcha in the Republick of Uzbekistan, Gissar Group Fields.Contractor - KNM (Kuala Lumpur, Malaysia).12.14 - 10.15 - Preliminary Gas Processing Terminals (UPPGs) “Northern Shady” and “Kuvachi Alat” ($800 mln), “Early gas stage of Kandym group of fields and development of northern part of Shady area. First start-up complex”. Contractor - HYINDAI Engineering Company (Seoul, South Korea).3D Modelling in Intergraph PDS/Smart Plant System, scheduling and As-built development based on 3D Models.09.12 - 12.14 - BCS “Khauzak” ($130 mln), “Booster Compressor Station in Khauzak Site” Contractor - KNM (Kuala Lumpur, Malaysia). Involved as Process, Piping and Mechanical Engineer (Rotating Equipment), Interface Coordinator.Recruitment and engaging of an External Consultant/Third Party Engineering Resources for Compressor Unit’s Piping System Issues (Stress Flexibility Analysis, Nozzles Loads Evaluation) by separate Contract; managing of all respective contract issues.

Manager in "Power Generation Department", Oil and Gas directing

SIEMENS

Энергетика и Энергоносители

5 месяцев

05.2012 - 10.2012

• Conducted equipment selection, calculation, and performance evaluations for gas turbines for combined cycle, gas compressor units, steam turbines, small compressor equipment, spare parts, mobile booster compressor units, and solutions tailored for the oil and gas sector. • Acted as the company's representative in prominent oil and gas operation companies within Ukraine. • Prepared tender documentation and actively participated in tender activities. • Collaborated with plant-manufacturers (e.g., Siemens), clients, and EPC contractors. • Generated technical and commercial proposals and engaged in negotiations concerning substantial oil and gas equipment deliveries with clients. • Provided design inputs related to static equipment and piping to the proposal department. • Ensured the application of effective business controls throughout projects, aligning with specified requirements. These controls encompassed HSE, commercial, financial, quality, integrity, and schedule aspects.Participated in the following projects:"Ukrtransgaz" Branch Enterprise (NJSC "Naftogaz"): CS Bar, CS Ananiev, CS Tal’ne - selected compressor units, provided technical and commercial proposals, and negotiated financing programs for the projects with Deutsche Bank support (funding of CS Bar was approved by the Ministry of Fuels and Energy) as part of the Reconstruction of the Ukrainian Gas Transportation System.JSC "Ukrnafta", JSC "Ukrgazdobycha": program development for implementation of Mobile Compressor Station Units for increasing of wellhead pressure for these Operators;JSC "Kiev Cardboard and Paper Mill" (KCPM) - organization of the commissioning works on Combine Cycle Gas Turbine Power Plant (CCGT);JSC "Crimean Soda" plant (OstChem Holding AG) - delivery and custom clearance of the Gas turbines for Combined Cycle Unit

Lead Process & Piping Engineer

LLC "KGNT-Ukraine" (branch of "KGNT" Kazakhstan)

Энергетика и Энергоносители

1 год 11 месяцев

06.2010 - 05.2012

• Undertook engineering and design tasks, encompassing P&ID and Piping utilizing AutoCAD Plant 3D. • Compiled tender materials, analyzed and addressed technical concerns within tender documentation, and managed expert remarks. • Conducted field supervision to oversee and ensure the performance and quality of works. • Managed and coordinated subcontractors and design organizations, assuming responsibility for technical management. • Generated P&ID, 3D models, isometric drawings, specifications, and various types of design documentation for technological units.Developed design documentation and supervised work with customers on various objects, including:Detail design for CS-2 and CS-7 on Kazakhstan-China main gas pipeline, "Asia Gas Pipeline LLP" (AGP), KazakhstanFEED of Surface Facilities Construction (low-temperature separation) for Svyridivske gas-condensate field. Customer – “Regal Petroleum” (UK-Ukraine Joint Company)Detail design of equipment and pipelines heat insulation at Gas Treatment Plants “Keymir” and “Akpatlavuk”Detail design for pump blocks manufacturing for Bagtiyarlyk and Dovletabad Compressor Stations - ENEX Process Engineering S.A, TurkmenistanReconstruction of gas measurement systems on reduction plants of CherkassyTransGazAdaptation of the project "Modernization of Shymkent Refinery Plant" (Kazakhstan)Development of documentation for the tender "Design and construction of a Gas Treatment Plant" (Kazakhstan).

Lead Process & Piping Engineer

JSC "Ukrenergogazproekt" (branch of "Sarovenergogaz-project", Russia)

Энергетика и Энергоносители

2 года 1 месяц

05.2008 - 06.2010

Conducted engineering and design of main and secondary process systemsManaged subcontractors and coordinated with themAnalyzed and resolved technical issues and operated with remarks of expertiseManaged quality and safety issues, and prepared materials for tendersConducted field supervisionDeveloped design documentation and supervised work with customers on various objects, including:Redesign of CS “Agryzskaya“and “Ordynskaya“ (“Permtransdaz”)Redesign of CS “Gremyachinskaya“ and “Kungurskaya“ (“Gazprom Transgaz“)Redesign of CS “Nadym“ (“Nadymgazprom“)Redesign of CS “Alekseevskaya“ (Krasnodar Territory)

Lead Process & Piping Engineer

JSC "VNIPITRANSGAZ"

Энергетика и Энергоносители

4 года 9 месяцев

08.2003 - 05.2008

Conducted engineering of gas-petroleum industry objects, including Underground Gas Storages, Compressor Stations, Gas fields, Gas Processing Plants, automotive gas-filling stations, petrol filling stations, petroleum storage depots, etc.Bundled equipment piping and prepared requirement specifications and designOperated with remarks of expertise and conducted field supervisionWorked with customers and provided design estimating, preparation of materials and documentation for tendersScheduled (SpiderProject)Developed design documentation and supervised work with customers on various objects, including:Russia Federation, Gazprom: FEED and Redesign of “Kasimovo“ Underground Gas Storage (UGS); Redesign of “Kaluga“ UGS; Detail design of “Sovhoznoe“ UGS;Ukraine, "Ukrtransgaz": Redesign of “Proletarian“ UGS, “Bilche-Volytsko-Ugerskoe“ UGS, “Bogorodchany“ UGS; Automotive gas-filling stations; Mekhedivske and Sviridovske gas field, Regal Petroleum Co.Ltd, UK/Ukraine;Kazakhstan: Redesign of CS “Opornaya“ №4;Malaysia: “PETRONAS Carigali” - Tender documentation of CS “Bintulu“;

Ключевая информация

Professional SummaryDynamic and results-driven Engineer and Manager with over 22 years of experience in oil and gas EPC projects and ore mining. Proficient in all aspects of the project lifecycle from initial development to successful operations. Skilled in project management, stakeholder engagement, and problem resolution. Experienced in collaborating with project leads and managers to ensure project adherence to schedule and efficacy while consistently delivering results within budgetary constraints. Adept at navigating complex regulatory frameworks and international standards ensuring compliance and quality control. Possesses strong leadership abilities fostering productive relationships with clients, contractors, and project teams.Key Skills:• Project Management• Engineering Design• EPC Projects• Stakeholder Engagement• Procurement Management• Risk Management• Quality Control• Process Engineering• Piping Design• Team Leadership• Contract Management• International Standards Compliance Experience Highlights:• Demonstrated extensive experience in various project engineering and management roles, including positions overseeing project controls and contracts, showcasing adeptness in managing diverse aspects of project execution. • Proven capability in successfully leading projects as a Project Manager across a spectrum of sizes, from small to medium-scale endeavors, and contributing significantly to large-scale EPFC/CM projects in pivotal capacities. • Profound comprehension of project lifecycle phases, encompassing design, engineering, procurement, construction, commissioning, and startup processes, coupled with adeptness in managing project interfaces and sequencing. • Sound familiarity with project controls and financial aspects, including scheduling, progress measurement, risk management, change control, and cost oversight, as well as basic knowledge of regulatory and funding requirements. • Strong analytical prowess demonstrated through adept problem-solving skills and the ability to discern viable solutions in complex project scenarios. • Proactive, goal-driven approach with an unwavering commitment to maintaining high performance standards and fostering accountability across project tasks. • Effective communication and leadership acumen, facilitating collaboration and consensus-building among diverse stakeholders to ensure project success. • Willingness to adapt and relocate as needed to support project requirements, showcasing flexibility and mobility in fulfilling project obligations.DescriptionProficient in collaborating with project leads and senior management to ensure the preservation of project schedule and efficiency, conducting comprehensive reviews of project implementation, and compiling pertinent data regarding project execution, planning, execution, monitoring, control, and closure across all facets of the project lifecycle. Demonstrates strict adherence to established Company methodology and other applicable standards, managing projects of significant magnitude up to $2 billion in scale.Engagement in Project Development initiatives and preparatory efforts, followed by active involvement in Project Execution endeavors throughout all stages of the projects.Rapidly establishes and cultivates relationships with sponsors, the Programme Manager, and pivotal stakeholders, adeptly comprehending their respective priorities. Proficient in conflict resolution and adeptly communicates challenging messages to the Decision Review Board with finesse. Collaborates to define and construct a mutually agreed-upon list of deliverables, aligning with the specifications outlined by the Decision Review Board or Programme Manager, while meticulously adhering to established time, cost, and quality parameters. Diligently monitors and reports on project advancement.Thoroughly familiar with IPMT LEP standards, encompassing the Engineering Management Plan Template, Contractor Prequalification Procedure, Basis of Design Definition Process Procedure, Engineering and Project Assurance Sub-Processes Basis of Design, Guideline in Quality Management Requirements for Contractors, HAZOP Procedure. Additionally, well-versed in LEP guidelines pertaining to the Lead Disciplines: Process, Mechanical, Piping, Structure, and associated Best Practices for the organization of Completions, Commissioning & Startup activities, along with adept Management of Change protocols.Operates in a multifaceted capacity within a Capital Projects engineering team, assuming roles encompassing Process, Piping, and Mechanical Engineer, as well as Procurement Manager and Project Control Manager. Proficiently navigates various project activities, including discipline coordination, vendor interaction, group meetings, client coordination, document distribution, exposure to site supervision, commissioning, and startup assistance.

Учился в 3 заведениях

Ivano-Frankivsk National Technical University of Oil and Gas

Economics (Oil&Gas)

Ивано-Франковск, 2006

Ivano-Frankivsk National Technical University of Oil and Gas

Mechanical Engineer, Oil&Gas Equipment

Ивано-Франковск, 2003

Ivano-Frankivsk National Technical University of Oil and Gas

Oil&Gas Equipment

Ивано-Франковск, 2003

Владеет языками

Английский

продвинутый

Может проходить собеседование на этом языке

Может проходить собеседование на этом языке

Advance, Queens College, NY, USA

Курсы, тренинги, сертификаты

SMART Buisness, Microsoft representative company

Киев, 2019

 Pre-PMP/PMI, Project Management Professional study

English Language and Literature, General

Другие страны, 2018

Intensive Course of English Language Study.

New York, USA

Дополнительная информация

Компьютерные навыки

3D design: Plant 3D Mechanical (P&ID, 3D Model, ISO, BOM), CADWorx, GasCAD, PDMS

and PDS (main issues control), Navisworks Manage with Gantt diagram transferring into

Primavera for construction works control management, MTO generating from 3D Model;

Process design:, HYSYS, GasCondOil, PRO II (partial), Flarenet, Flaresim;

Stress analysis: Caesar II, СТАРТ; Mechanical: PV Elite, Nozzle PRO;

Experienced user MS Office, MSProject, Primavera.

Владислав

Project Manager, Project Engineer, Engineering Manager

Киев

43 года

Активно ищет работу

полная занятость