Працював в 12 компаніях 27 років 3 місяці
Будівництво
Proiect Manager / Construction Manager TQMS
DG Industries GmbH (Ferrostaal Industrieanlagen GmbH)
Будівництво
7 років 2 місяці
01.2017 - 03.2024
The project is the reconstruction of the Bar compressor station of the Soyuz gas pipeline. Engineering, procurement, construction, commissioning(EPC).
Dismantling of two old units Installation of two new units supplied by GE Reconstruction - two GPU buildings, electrical systems, fuel gas treatment system, compressed air system, fire extinguishing systems, lighting, GPU control systems, renovation of instrumentation and control equipment, pre-commissioning and commissioning.
Responsibilities:• Development and implementation of management system in accordance with the requirements of ISO 9000:2008 \ PMBOK 4 and customer requirements. Development Project Plan, QA/Qc Manual and Project procedures.• Management of Quality System• Preparation, approval and updating of the Project Schedule.• Verification of design documentation for compliance with customer requirements, national and international standards.• Organizations and inspection of the Supplier during the manufacturing of equipment and materials.• Evaluation of potential subcontractors and suppliers to meet project requirements, national and international standards.• Daily monitoring of construction works at all stages of construction.• Organization of inspections of the works activity performed by subcontractors.• Preparation of a report to Senior Management on the operation of the QMS.• Control of non-conformance and the preparation and implementation of corrective actions.• Organization of the training project personal.Ensure the project Quality, Risk Assessments, safety assurance and HSE management throughout the project (adhere ZERO policy).
Project Director
SGC
Будівництво
3 роки 11 місяців
01.2013 - 12.2016
Yamal LNG Project
YAMAL LNG is an integrated project encompassing natural gas production, liquefaction and shipping. The Project consists of construction of a liquefied natural gas (LNG) plant with an output capacity of around 16.5 million tons per year, using the South Tambey Field as a resource base. The field’s proven and probable reserves, by PRMS standards, are estimated at 926 billion cubic meters. Extensive transportation infrastructure is being built in the scope of the Project, including a sea port and the Sabetta Airport.The entire project is expected to cost approximately $27bn.
Responsibilities includes co-ordination from E.P.C. bid preparation, including preliminary engineering designs, participation in pre bid and post bid negotionations, appointing engineering consultants, for detailed design engineering, technical specifications, for all the equipments.The main responsibilities include providing planning, leadership, direction and technical expertise in managing the timely procurement of materials, equipment / plant and labour resources, delivery to site and construction of the sub contract work packagesDevelop and manage the plans, budgets, Effective internal/ external stakeholder management.Ensure the project Quality, Risk Assessments, safety assurance and HSE management throughout the project (adhere ZERO policy).Manage, coordinate and supervise the construction process from the conceptual development stage through final construction and handover to Completions on a timely and economical basis. Responsible for coordinating and managing contractors, materials and equipment, schedules and contracts whilst maintaining client satisfaction and international standards of quality.Directs the construction activities and executes the construction works in line with the delivery schedule, contract specifications and conditions Assurance of close-out/ commissioning certificate, securing the final project to regulatory satisfaction.
Construction Manager TQMS
JSC Stroytransgaz
Будівництво
2 роки 11 місяців
01.2010 - 12.2012
Customer: DESFA
Construction of a compressor station Nea Messimvria
Two compression units consisting of a centrifugal compressor (SOLAR 453) and gasturbine (SOLAR TAURUS 70) of 7,7 MW power each one in operation and one in backup.
Construction Manager TQMS
JSC Stroytransgaz
Будівництво
2 роки 11 місяців
01.2008 - 12.2010
Customer: DOLPFIN
Construction of gas pipeline o 48” total light 243 km from Aubu Daby to Fujairah.
Construction Manager TQMS
JSC Stroytransgaz
Будівництво
3 роки
12.2005 - 12.2008
Customer: ARAMCO Saudi Arabiya
Construction of grid oil pipeline o 30” total light 218 km
Manager TQMS
PetroGas
Будівництво
1 рік
12.2004 - 12.2005
Customer: Dragon Oil (Turkmenistan) Ltd.
Turnkey project "Oil Treatment Plant", consisting of a pumping station, a treatment plant, a tank farm.
General Customer: State Agency for Management and Use of Hydrocarbon Resources under the President of Turkmenistan.
Customer: Dragon Oil (Turkmenistan) Ltd.
Turnkey project "Reconstruction of the oil platform LAM 10". Shelf of the Caspian Sea, Turkmenistan.
General Customer: State Agency for Management and Use of Hydrocarbon Resources under the President of Turkmenistan.
Customer: Dragon Oil (Turkmenistan) Ltd.
Turnkey project "Subsea pipeline between platforms LAM-13-LAM-21, LAM-13-LAM-22, LAM22 - LAM-10, LAM-75-Block-2, LAM-A-LAM-63". Shelf of the Caspian Sea, Turkmenistan.
Construction Quality Manager
PetroGas FZE
Будівництво
10 місяців
01.2004 - 11.2004
General Customer: SC "Turkmengas"
Customer: Progress Engineering, UAE
Construction of the compressor station "Yylanly" (capacity 90 million m? per day).
Construction Quality Manager
PetroGas
Будівництво
10 місяців
02.2003 - 12.2003
General Customer: SC "Turkmenneft"
Customer: CJSC "Ukrgazpromstroy", Ukraine Reconstruction of gas-lift compressor station "Goturtepe".
Power of the compressor unit, MW: 16.0 - 8 pcs.
Number of compression stages: Three
Productivity: 12.0 million Nm3/day
Pressure, kgf\cm2: Entrance: 3.5; Yield: 57.9
Construction Quality Manager
PetroGas
Будівництво
2 роки
01.2001 - 01.2003
General Customer: "Turkmenbashi Complex of Oil Refineries" (TCOR). Customer: TECHNIP, Germany.
Diesel fuel hydrotreatment unit at TKNPZ. Project budget 130 million euros
Manager TQMS
Petro Gas FZE
Будівництво
1 рік
01.2000 - 01.2001
General Customer: SC "Turkmenneft"
Customer: Chalik Energy TPS Limited, Malta
Construction and commissioning of a power plant with a capacity of 126.4 MW
Project Engineer
PJSC ZanGaz
Будівництво
2 роки
01.1998 - 01.2000
Customer: SIRTE OIL COMPANY LibyaConstruction of 2 compressor stations, O34” pipeline Homs to Tripoly
Senior Planning Engineer
Ukrgazbud
Будівництво
1 рік
01.1997 - 01.1998
Project: site preparation for the construction of a shelter facility at the Chernobyl nuclear power plant
Ключова інформація
More than 20-year experience in Construction, Inspection, Design and Management in Oil and Gas industry. Realization of Projects in different climatic and geological conditions. Gulf experienced and major International Projects. An established reputation for self-motivation, attention to detail and organizational skills guaranteeing deadlines and budgets are met on time. Possessing the ability to think analytically, strategically and creatively, remaining focused under pressure whilst managing multiple tasks. Active, self-improving, eager to increase professional level, able to obtain goals, orderly, responsible, communicative. Team player with good interpersonal skills. Wide knowledge of CIG and international standards of construction, design , quality and safety. No bad habits. No medical contraindications.
Specialization
Project Management, Quality Management, Quality Assurance and Quality Control, Productivity Improvement, Certification, Internal and External Auditing
Навчався в 1 закладі
STATE ACADEMY OF TRANSPORT, KHARKOV
Managment
Ukraine, 1998
Володіє мовами
Англійська
поглиблений
Може проходити співбесіду на цій мові
Може проходити співбесіду на цій мові
Курси, тренінги, сертифікати
Financial Engineering and Risk Management Coursera, Financial Engineering
Construction Project Management Columbia University, Project Manager
Construction Finance Columbia University, Project Managment
Budgeting and Scheduling Projects University of California, Irvine, Project Managment
TUV
HSE training program
Certified Lead Auditor ISO 9001:2008Certified Internal Auditor ISO 9001, ISO 14001, OHSAS 18001
ARAMCO Certified QMS Manager
ARAMCO Certified QMS Manager
• Welding NDT Inspector Level II acc. with EN 473 / ISO 9712
Welding NDT Inspector Level II acc. with EN 473 / ISO 9712
Quality Management Systems (QMS)» - Training Program of TUF Company, Rainland/Berlin-Branderburg
Quality Management Systems (QMS)» - Training Program of TUF Company, Rainland/Berlin-Branderburg
Primavera 3 PRO PM-Soft, Project Managment
Додаткова інформація
Driver's license
B
Computer skills
MS Office, MS Project, Primavera P6, AutoCAD, ABK-5(user)
Pavlo G
Pavlo G
Project Manager
Київ
Активно шукає роботу
повна зайнятість
Оновлено 2 години тому