Работал в 10 компаниях   16 лет 4 месяца

Негосударственные организации / NGO, Фармацевтика, Строительство, Энергетика и Энергоносители, Транспорт и Логистика

Water sanitation WASH manager

MSF - Doctors Without Borders / Лікарі без кордонів

Негосударственные организации / NGO

10 месяцев

08.2023 - по настоящее время

WASH activity of MSF, was related to Kahovska dam consequences

I performed Technical support/advising of MSF’s field teams who were doing wells cleaning procedures. (as a part of stomack disease prevention)

I updated technical side of wells cleaning & disinfection procedure. (procedure and equipment)

I managed field work and relations between WASH cluster participants, (assessment, due diligence, contractor selection, relations management, bore halls drilling supervision, complete works acseptance)

Also, I developed water and energy backups in MSF locations (UPS, generators, water tanks, treatment, storage, distribution) also as a part of winter preparation plan.

As an personal achievement, I’ve made it working in automatic mode, without any technical supervision in place, only periodic routine maintenance.

Interpriteur (Translator)

MSF (Medecins Sans Frontieres)

Негосударственные организации / NGO

3 месяца

03.2022 - 06.2022

I was a mental and language bridge between Ukrainians in (Ukrainian railways) and Belgium specialists from MSF, all together we made a "medical train project".

I assisted MSF engineers with local tips and tricks to complete the project.

Also, I did an "emergency medical aid, pharmacy stock", and assisted to maintain it.

I've taken a part in the implementation of the "medical train project", and now it runs and works. I made pharmaceutical stock from a "Giant mountain of boxes" in the warehouse, in an emergency context, Including cold chain storage, and cold chain preparation procedure updates.

Сommissioning, startup, validation, engineer.

self employed

Фармацевтика

6 месяцев

08.2020 - 02.2021

"Man in the middle" in contractor-customers. relations.

Providing a full scope of works, between systems and equipment installation, and startup, as following:

  • "As build" inspection, changes review, changes legalization.
  • Systems and equipment startup, commissioning.

- smooth transfer of equipment from installation to the final user, and routine exploitation

  • Preparation and development of full package of validation documents.
  • Development of validation masterplan
  • Development of Validation methods, and protocols DQ IQ OQ PQ
  • Development of routine operation maitenance SOP's.

Chief project engineer (Project manager)

JSC "Mirassolutions"

Строительство

2 года 5 месяцев

03.2018 - 08.2020

"Relations manager of teams", customer-contractor-installers.

Company profile:

- Development of complex technological projects from zero, to success, in industrial pharmacy, pharmacy-microbiology, agrochemical, medical labs, etc.

What I did (my responsibilities):

Project

- Development of optimized solutions, between price-functionality-regulatory requirements, in new and existing manufacturing sites of customers.

- Writing User Requirement Specifications "URS"

- Development of basic layouts and PID (plans, flowcharts, principal schemes)

- Review and approve the basic design and general solutions, with the customer

- Pre-calculations of the project cost.

- Receiving incoming and outcoming information, checking for regulatory and commonsense issues, checking drawings for clashes, and outputting project documentation.

Installation works

- Detailed cost calculations, (work with equipment and material suppliers).

- Contracting, (customer contracts, subcontracts, supply contracts)

- Search for work performers (people) and contactors (organizations)

- Organization of site works

- Acceptance of work

Commissioning works

- Developing "as build" and "first run" documentation,

- Individual and complex commissioning and startup

- Customer personnel training.

- Handover to customer.

Ventilation design engineer

NOVARKA

Строительство

7 месяцев

08.2017 - 03.2018

I was the person who "bridge the gap" , between international management team, and the Ukrainian construction site reality, mentally and physically. (project office - site installation team - customer team) relations.

Implementation of the detailed design.

Develop design of untypical components, interface connections.

Solving clashes (collisions) between different engineering systems.

Managing staff/subcontractors coordination with the installation team.

Monitoring and maintaining the Engineering Department schedules to ensure the overall Project schedule is maintained.

Identifying the eqipment input requirements.

Ventilation, Air Conditioning and Cleanroom Expert

PJSC Farmak (chemical pharmaceutical industry)

Фармацевтика

3 года 10 месяцев

10.2013 - 08.2017

Main responsible person for all new HVAC & Cleanroom development.

A complete cycle of development of ventilation systems from "scratch" for facilities of the pharmaceutical plant (such as: laboratories, manufacturing sites, explosion-hazardous workshops, materials warehouses, and offices).

My responsibilities included:

a complete cycle of activities starting from an elaboration of project tasks, pre-calculations of potential costs for implementation/operation. Supporting of projects from the stage of "project tasks definition" to stages of "project implementation", preparation of specifications for tenders, supervision of installation and commissioning activities, until acceptance of work and as-built documents from contractors, in accordance with national, and industrial and corporate requirements, followed by validation and transfer of a system to the point of use.

Personal accomplishments: experience in designing of ventilation systems and cleanrooms for potentially explosive&hazardous sites, ability to find compromised solutions between requirements of GMP, ISPE, and DSTU, standards.

HVACR System Engineer

PJSC Arterium (pharmaceutical industry)

Фармацевтика

1 год 4 месяца

06.2012 - 10.2013

Main responsible person for "all HVAC systems, of the whole plant".

Organization of continuous, failure-free performance of ventilation systems in pharmaceutical manufacturing facilities.

Planning and organization of maintenance activities.

Quality inspection of works done by contractors (Permission and acceptance).

Maintenance and development of operation documents (SOP).

Development of annual budgets, and preparation of purchase orders.

Performing of validation activities for cleanroom. Participation in re-certification of sites, and "protection of ventilation systems" during external inspections.

Participation in design development - review of technical solutions, and construction plans.

Experience in:

building management systems (BMS), autonomous and centralized chilling and heating systems, commissioning, and startup. ability to troubleshoot "non-typical failures".

Basic skills of the administration of SCADA systems.

Knowledge of GMP regulations.

Engineer of Process Automation Department

State Enterprise “Rehionalni Elektrychni Merezhi” (Regional Electric Grids)

Энергетика и Энергоносители

2 года

06.2010 - 06.2012

Responsible for all routines in development of national commercial electricity accounting system.

Organization of activities for the implementation of automated energy control and metering systems, and process automation systems in the electric grids of the company.

Control and review of activities performed, analysis of the database, and preparation of reports to controlling authorities.

Ventilation and Air Conditioning Installation Engineer

Arktika LLC (Sale, installation, maintenance of HVAC systems)

Строительство

2 года 4 месяца

03.2006 - 07.2008

Installation and maitenanse "all about HVAC&R"

Installation of air conditioning systems, air handling units, soldering of pipelines, installation & repair of chillers, installation of automation systems, commissioning, working with drawings, and design documentation.

Repair of ventilation systems: troubleshooting, repair of refrigeration machines.

Motor Mechanic

Aves (Car service center for Japanese, Korean cars)

Транспорт и Логистика

1 год 10 месяцев

05.2004 - 03.2006

I came "nobody",than became "That Gyu, who build&maintain racing cars".

Responsibilities:

Repair and maintenance of Japanese cars, an overhaul of petrol/diesel engines, transmission, breaks and hydraulic systems, chassis, valve train, transmission gearbox.

Preparation of cars for Yalta RALLY, maintenance of race cars in a rally environment.

Ключевая информация

Looking for a significant emergency renovation or development project. Where strong technical skills are reqired.

Учился в 2 заведениях

National University of Food Technologies

Energy, Bachelor-Energy machine building/ Specialist- cooling machines

Киев, 2012

Simferopol College of National University of Food Technologies

Machines and Equipment, Installation and Maintenance of Refrigeration Compressor Machines and Equipment

Симферополь, 2008

Владеет языками

Английский

свободно

Может проходить собеседование на этом языке

Может проходить собеседование на этом языке

Русский

родной

Может проходить собеседование на этом языке

Может проходить собеседование на этом языке

Украинский

родной

Может проходить собеседование на этом языке

Может проходить собеседование на этом языке

Дополнительная информация

Водійське посвідчення

В В1

Denys

Shelter and Construction Technical Advisor / Технічний радник з питань укриттів та будівництва

Киев

35 лет

Активно ищет работу

полная занятость, неполная занятость, проектная работа

Характер работы: удаленная работа, гибридная, в офисе/на месте

Обновлено 2 недели назад