Работала в 6 компаниях 11 лет 3 месяца
Негосударственные организации / NGO, Строительство
Civil engineer
People in Need
Негосударственные организации / NGO
9 месяцев
03.2024 - по настоящее время
- Organization of repair and construction works for the opening of new outlets;
- Technical inspection and measurements of new facilities;
- Development of technical specifications and estimates for repair and construction works;
- Concluding contracts for repair and construction works;
- Controlling the work of contractors at the facility, acceptance of work performed;
- Reviewing certificates of completion, and commissioning of facilities;
- Supporting the process of work execution at all stages of project implementation, supervising construction works, interacting with the Project Manager;
- Assist the customer in collecting construction permits, obtaining technical specifications, passing the project examination process, and obtaining the Permit to Start Construction of Facilities;
- Coordinate activities with other projects;
- Conducting needs assessments and preparing defect reports and estimated cost of works;
- Conducting regular field visits to construction sites to ensure the quality of work and provide advice as needed;
- Ensuring that the project is implemented in accordance with the law and state building codes, ensuring that standards are applied in each case.
Estimator
People in Need
Негосударственные организации / NGO
1 год 6 месяцев
09.2022 - 03.2024
• Microsoft Excel
• Microsoft Word
• Financial control
• Financial analysis
• AutoCad
Calculation of estimates according to defect reports in the AVK software package.
Participation in the preparation of defect reports.
Selection of norms for a particular type of goods and services, in accordance with the norms, as well as observing the basic rules and requirements set forth in regulatory documents.
Preparation of estimate documentation in accordance with the requirements of the KNU RECNr, for the organization's procurement under defective acts (reconstruction projects).
Verification of the Acts of Completed Works in the form of KB2 and KB3.
Participation in the approval of changes to design decisions and standards together with the engineer.
Participation in the development of concepts and solutions for reconstruction together with a team of engineers.
Control over the quality of work performed and materials used.
Verification of the number of completed works submitted by contractors for compliance with the actual.
Estimator
LLC “BK TEKKOMBUD”
Строительство
3 года 4 месяца
04.2019 - 08.2022
Preparation of certificates of completion.
Participation in the coordination of changes in design solutions.
Maintenance of accumulative statements.
Site visits to draw up defect reports.
Protection of the scope of work at the Customer.
Preparation of work schedules.
Creation of internal tenders, analysis of participants.
Development of cost estimates and excel.
Estimator
PolarHouse Украина
Строительство
6 месяцев
06.2018 - 12.2018
• AutoCad
• Sema
• Microsoft Excel
• Microsoft Word
• Evernote
Architect
PolarHouse Украина
Строительство
4 года 2 месяца
04.2014 - 06.2018
3D-models of the cottage,
- ARCHITECTURAL SOLUTIONS section,
- WOOD CONSTRUCTIONS section, -
Engineering Networks design project,
- development of detailed drawings of wooden products,
- estimate documentation.
Civil engineer
Institut Donbassreconstraction
Строительство
9 месяцев
07.2013 - 04.2014
Development of AR, AI kits, site
visits and measurements.
Work with the regulatory framework of DBN, SNiP, DSTU, rules for drawing up drawings.
• AutoCad
• Microsoft Word
• Microsoft Excel
Училась в 1 заведении
Донбаська національна академія будівництва і архітектури
Industrial and civil construction
Макіївка, 2013
Владеет языками
Английский
средний
Курсы, тренинги, сертификаты
Essentials of Blast-induced Damage Aseessment and Repair
https://openbadgefactory.com/v1/assertion/263fe9d92c0df048d77ae38ffeb12b44335c0d76
Professional course AVK5. ESC "Cursor"
Local estimates. Program AVK 5.
Pricing in construction. Seminar "Business Club”
The practice of determining the cost of construction of buildings and structures (including destroyed or damaged) Procedure for development, approval, approval and application. List of estimated documentation - increase in the cost of material resources.
Professional development for construction industry specialists. Construction - modern technologies
New possibilities of estimating software complexes. Master class on PC AVK-5
Estimated case of AVK-5
Local estimates
Advanced training course "Estimating" in DonNASA
Advanced training course "Estimating" in DonNASA
Дополнительная информация
Компьютерные навыки
Yevheniia
Yevheniia
Civil engineer
Киев
Активно ищет работу
полная занятость, неполная занятость
Характер работы: удаленная работа
Обновлено 6 дней назад