Работал в 12 компаниях 27 лет 11 месяцев
Строительство, Промышленность и Производство
Chief engineer
Privet practice with humanitarian organization
Строительство
1 год 1 месяц
02.2022 - 03.2023
- Revit
- AutoCad
- Estimated programm for BoQ (Smeta)
- Calculate programm SCAD
Leading engineer with design and BoQ documentation, category B3
International Committee of the Red Cross Delegation
Строительство
2 года
06.2019 - 06.2021
Functional responsibilities:
- Supervise the design work of personnel on all types of projects and carry out quality control during the design and construction of the infrastructure established by the ICRC.
- Prepare implementation / progress reports at intervals set by the project manager
- Create project files in electronic databases (such as the WatHab Project Assistant application) and keep them up to date
- Manage tenders for construction projects and procurement of materials in accordance with the logistics and financial rules of the delegation.
- Engage with stakeholders, monitor safety issues related to project sites, and advise the (Deputy) Water and Habitats Coordinator if necessary; regularly provide inspectors with information on safety, stakeholder concerns and progress on the site
- Perform and analyze construction needs assessments, perform surveys, and share the analysis with the WatHab Coordinator (Deputy) for Water and Habitats.
- Manage the transfer of ICRC infrastructure to end users.
- Train or organize training end users in project implementation and data analysis
- Execute documents (drawings, bill of quantities, contracts, etc.) for an engineering project in approved formats; monitors the implementation of the project for compliance with the project documentation, ICRC standards, providing corrective actions, if necessary
Considers achievements:
- Span of buildings 12m, 24m. Assessed risks in terms of stability, strength, durability in accordance with international standards IATG 2.10; 05.30; 01.80; The object is located in Moldova
- Drafted tenders, searched for construction companies and teams to perform construction work, as well as search and purchase construction materials. Controlled the quality of the work performed in accordance with the project documentation. The direction is related to the reconstruction of buildings (roofs, walls, internal engineering aspiration and plumbing works and projects).Coordinated construction processes. The object is located in Dnepr
- Calculated and designed a quickly assembled and dismantled building with an internal metal frame according to the customer's requirements at the P (KM) stage.Modular structures with a span of 7.5m. The certificate of design engineer of the category CC3 is available. The object is located in Dnepr
- Carried out BoQ for bids of varying complexity in the "Estimate" program, version 4.5. Prepared reports on the work done in the internal program of the ICRC
- Assessed the risks or safety of the construction processes during construction in accordance with the developed PPR
- Performed the preparation of technical specifications (taking into account the customer's preferences) for design and construction in accordance with DBN А.2.2-3-2014, Appendix B
- Conducted an examination of projects of the CC3 category of complexity (the certificate of the leading engineer of the expert builder of the CC3 category is available)
Examination of design documentation, design of metal structures, reinforced concrete structures
FOP, series B03, No. 28815, dated April 15, 2008, record number in the single register of physical specimens 21780000000002331, Ind. The code: 2675603216
Строительство
4 года
12.2014 - 12.2018
STROYINVEST-SERVICE COMPANY LLC
Title: Reconstruction of preschool educational institution №113
Addresses: st. Zdolbunivska, 3-B with floor completion and thermal modernization of Kyiv
Difficulty category: CC3 (determined by the number of people who are permanently on the site)
Function: Calculation and design of superstructure overlapping (Monolithic sections and Prefabricated slabs), calculation of wooden covering, design at stage P. Checking of foundations for Additional LOAD from superstructure and wooden roof
Services: Execution of calculations and design at the stage of P superstructure, inspection of foundations and existing buildings
STROYINVEST-SERVICE COMPANY LLC. PORTO-POINT LLC
Title: Reconstruction and construction with expansion of buildings and constructions of the property complex with their further operation and maintenance under objects of household services, trade and office premises
Address: Ave. Stepana Bandera, 16-D in the city of Kyiv
Difficulty category: CC3 (determined by the number of people who are permanently on the site)
Function: Calculation of a monolithic framework, also separately columns, overlapping plates, beams. Drawing up of tables of expenses of materials (separately columns, plates of overlapping, reinforced concrete beams)
Services: Calculation at the stage "P", a metal framework of a canopy. Providing tables of material costs
STROYINVEST-SERVICE COMPANY LLC. TMC LLC
Title: Canopy of the entrance group "Territories of minimum prices"
Address: st. Sviatoshynska, 1, Kyiv
Difficulty category: CC3 (determined by the number of people who are permanently on the site)
Function: Calculation and design of a metal framework of a canopy in the SCAD software package, check on strength of structures, stability of columns, trusses, beams. Creation of schemes, knots of adjunction of elements of a skeleton. Compilation of a table of metal costs
PRO "ENGINEERING GROUP", LLC "Ecosystems of Ukraine" - IV-22/14
Title: Kuznetsovsk City Utility Company. Development of design and estimate documentation for the reconstruction of the Ministry of Internal Affairs in Kuznetsovsk
Address: MOS Kuznetsovsk, city treatment facilities
Difficulty category: CC3 (determined by the number of people who are permanently on the site)
Function: Calculation of the bottom and walls of the treatment plant (Aerotenks) for strength and stability, reinforcement of the bottom and walls
Services: Calculation and design at the stage "P" Aerotenkov
PRO "ENGINEERING GROUP", LLC "Ecosystems of Ukraine" - IV-22/14
Title: Reconstruction of hydraulic structures with the creation of a return water supply system of the National Dendrological Park "Sofiyivka", restoration and maintenance of a favorable hydrological regime and sanitary condition of the river Kamyanka, landscaping in the lower reaches of the river Kamyanka (adjustment)
Address: Uman, Sofiyivka Central Park
Difficulty category: CC3 (determined by the number of people who are permanently on the site)
Function: Calculation of angular walls, namely: calculation of overturning and settlement, the strength and stability of the walls, the selection of reinforcement, reinforcement of slabs and walls (creation of formwork drawings and wall scans)
Services: Calculation and design of retaining walls at stage "P". Compilation of a table of material costs
Project documentation expert
Bureau Veritas Ukraine LLC, Kiev
Строительство
1 год
12.2013 - 12.2014
2012 - 11.2014 (worked part-time)
Functional responsibilities:
- Checking the completeness of the design documentation for the part of (Reinforced concrete structures) and (Metal structures) at the P and R stages, which includes:
- Checking the collection of loads on the building frame (collection of loads on the coating, on the facade of the building);
- Coordination with the customer of the coefficient of responsibility of buildings, structures according to DBN V.1.12-14-2009, clause 7.6, v.5v;
- Data on engineering and geological research;
- Integral verification of the calculation in the "SCAD" program of the frame according to I, II - the limit state of buildings, structures according to DBN V.1.2-12-2008, DBN V.2.1-10-2009 p.9.15, DBN V.1.2-14.2009 "The basic principle of safety and security of construction, construction, awakening constructions and foundations";
- Calculation of individual load-bearing structural elements in the "SCAD" program of the building according to I, II-limit state for strength, stability, crack-resistance. For foundations - for punching shear, settlements (from static and dynamic influences). Calculation of piles for bearing capacity, for pile settlement. Checking the reinforcement of structural elements (columns, slabs, floors). In general, the structures must meet the requirements of DBN V.2.1-10-2009, DBN V.1.2-14-2009. Verification of calculations for strengthening slopes with retaining walls, in some areas with geogrids;
- Checking of certificates of author's, technical supervision for the implementation of the above design work.
- 2. A general conclusion is drawn up on the basis of the materials provided (drawings, specifications and requirements), which includes:
- Evaluation of quality and indication of mistakes made in the calculation of structural elements (foundations, walls, columns, floors, in general, the entire frame of the building). The calculation of "ZhB", "MK" must be performed in accordance with regulatory documents (DBN V 1.2-2.2006 "Loads and Impacts", DSTU BV.1.2-3.2006 "Deflections and displacements", DBN V.2.6-163.2010 "Steel constructions ". Design, manufacturing and installation standards. DBN V.2.6-98: 2009 "Concrete and reinforced concrete structures");
- Conformity of the manufacture and installation of structures with the requirements (PPR) in accordance with the documents SNiP 3.03.01-87 "Unsuccessful and kitchen garden jugs". DBN А.3.2-2-2009 "Protection of pratsi and promislov bezpeka at budivnistvі". DSTU BV.2.6-75.2008 "Metal construction constructions";
- Evaluation of the quality of nodal connections "MK" (For example: check by calculation of welded and bolted joints, external assessment of the quality of the completed assemblies with the fixation of comments in the book of author's supervision) in accordance with TG.1, supplement Zh, DBN V.2.6-163.2010 "Steel structures". GOST 9466-75, then GOST 9467-75
- Quality of anti-corrosion protection of metal structures SNiP 2.03.11-85 "Protection of building structures from corrosion." SNiP 3.04.03-85 "Protection of building structures and structures from corrosion. GOST 12.03.005-75 "Occupational safety standards system. Painting works. General safety requirements "
Successful implementation of projects:
- Construction of the shopping and entertainment complex "Ashan" in the area of ??113-114 km of the Slavyansk - Donetsk - Mariupol highway in the Gornyatsky district of the city. Makeevka, Donetsk region. II stage of construction
- Construction of a shopping and entertainment center with office premises, parking and guest) parking (1cherga) as part of a multifunctional complex and improvement of the coastal protective strip of the lake on the street. Bazhan and st. Revutsky (near Lake Vyrlitsa) in the Darnytskyi district of Kiev. Engineering preparation of the ter
Leading design engineer
“State enterprise Design Institute UKRMETROTONNELPROJECT», Kyiv
Строительство
2 года 8 месяцев
02.2012 - 10.2014
- Functional responsibilities:
- Calculation of the frame of reinforced concrete structures of KZh, underground metro stations, foundations, basements, retaining walls, ground pavilions (SKAD program);
- Development of design documentation for KZh (reinforced concrete structures in AutoCAD ASD- Structural Detailing);
- Distribution of work within the team with subsequent monitoring of work performance;
- Design of underground structures (metro stations, foundations, basements), ground pavilions for retail and office premises, as well as their operation in the seismic zone according to DBN V.2.6-312006;
- Calculations of non-standard reinforced concrete structures operating on static, dynamic from equipment (for underground metro stations, static from 5 to 30 t / m2, for individual foundations for equipment, static of about 25 -100 t / m2, taking into account dynamic from 2 to 5 t / m2);
- Reinforcement of reinforced concrete frame technological structures (reinforcement of floors for additional equipment by laying and fixing additional reinforcement to the slab in the stretched zone, installation of additional deformation ties on the plinth of the foundations, a project to strengthen the columnar strip foundations);
- Separate study of foundations for dynamic loads (technological pressing equipment, flour-grinding equipment);
- Calculation and design of circular tunnels (in the SCAD program). Calculation "Wall in the soil" for strengthening slopes and pits, calculation and design of pile foundations;
- Drawing up technical specifications (including the collection of loads, determining the class of responsibility of a building, structure, service life), including cover letters, outline studies of various solutions for assignments. Drawing up acts of work performed;
- Connection of architectural solutions, engineering networks with the structural part (for example: coordination of underground communications in tunnels and metro stations (engineering networks of water supply, sewerage, electrical wiring, technological hatches according to SNiP 2.09.02-85 * and SNiP 2.08.01-89);
- An indirect task of finding new customers and partners for this type of work in order to increase the quality and volume of work;
- Training junior staff in basic approaches and skills in work;
- Planning the complex of works to be performed (Project program) with a breakdown by the dates of the beginning and end of the design.
Considers achievements:
Objects built in Moscow:
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction. Station "Khodynskoe Pole"
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction.Pavilion No. 1
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction.Station "Khoroshevskaya" and transfer at the station "Polezhaevskaya" TCL
Objects built in Kiev:
- Underground metro station "Teremki". Entry group. Work code - VX_5.6_DMS-17.17A_DML-10_S1.2928
- Underground metro station "Teremki". Lobby room. Code of work - Entrance hall No. 2_Gate No. 5.6_ДМС-14_14А_IZM.1
- Underground metro station "Taras Shevchenko".Technological ventilation group. Code of work - ДМП.2_№122
- Underground metro station "Taras Shevchenko". Technological branched ventilation group. Job number -№222
- Bureau Veritas Ukraine LLC, Kiev. Verification of design documentation of the category of complexity CC3. Leroy-Merlin objects, shopping and entertainment center in Lviv
Chief designer
LTD “Arsenal Center ", Kiev
Строительство
3 месяца
05.2011 - 08.2011
Was taken on a labor agreement for a set of works
Functional responsibilities:
- Control and coordination of complex drawings during construction as they are received from the designers;
- Drawing up technical specifications based on the customer's requirements;
- Planning the complex of works to be performed, broken down by the dates of the beginning and end of construction;
- Completion of technical documentation;
- Preliminary calculation of grillages for piles (warehouses);
- Checking collection of loads on the frame to determine the support forces on the foundations;
- Conducting technical supervision over complex works.
Considers his achievements:
Reconstruction of industrial buildings, warehouse buildings
Leading design engineer
JSC “Ukrainian Research and Design Institute of Steel Structures named after V. N. Shimanovsky»
Строительство
3 года 2 месяца
11.2006 - 01.2010
Functional responsibilities and achivements:
- Development of design documentation for CM (metal structures);
- Distribution of work within the team with subsequent monitoring of work performance;
- Designing the serviceability of warehouse buildings and structures in the seismic zone according to DBN V.2.6-312006 (The calculation takes into account the deformations of structures not only in the horizontal plane, but also in the vertical one);
- Development of non-standard solutions for structures operating on static load (point loads from high-rise towers from 50-250 tons);
- Reinforcement of multi-storey frame structures of more than 4 floors (atypical solutions preventing the operation of nodes on the layering / layering of nodes);
- Development of structures operating on dynamic loads (for escalators, lifts);
- Construction of smoke removal towers, height from 30m-100m;
- Design of sites for engineering communications (suspended platforms);
- Drawing up technical specifications, including cover letters, sketches of various solutions. Drawing up acts of work performed;
- Connection of architectural solutions, engineering networks with the structural part (for example: alignment of smoke exhaust pipes with an architectural solution for elevations, slopes, wall fences. Linkage of lifting mechanisms, elevator shafts and escalators with evacuation passages according to SNiP 2.09.02-85 * and SNiP 2.08.01-89);
- Searching for new customers and partners for this type of work in order to increase the quality and scope of work;
- Training junior staff in basic approaches and skills in work;
- Planning the complex of works to be performed, broken down by the dates of the beginning and end of the design;
- Completion of technical documentation.
The candidate is directly subordinate to:
5-11 design engineers
Deputy Director for Design
PE "Occam's Principle”
Строительство
2 года 2 месяца
01.2005 - 03.2007
02.2005 - 04.2007 (private practice with temporary employment, work on several projects at the same time)
Responsibilities:
Tasks related to design and construction
Design Team Leader
Sumy design and construction company "Ukrrosmetall" Design Team Leader
Строительство
9 месяцев
08.2003 - 05.2004
Work under a labor contract for a year
Design of the superstructure of the object at 40 Ushinskogo, "Book Factory", Kiev.
Superstructure of the attic and roof from metal structures. Calculation of a warehouse building for storing coils for making a seal (weight 10-15t)
Design engineer
LLC MC "Repair construction management No. 1"
Строительство
1 год 3 месяца
05.2002 - 08.2003
Design of cottages, retaining walls, reconstruction of buildings. Calculation of foundations for cottage construction
Technician-technologist for technological equipment (in woodworking) and metal structures
JSC "Mogilev-Podolsk machine-building plant named after S. M. Kirov”
Промышленность и Производство
7 лет 1 месяц
04.1995 - 05.2002
Development of technological equipment for wood and metal products. Drawing up technological maps for the manufacture of metal frame construction for equipment with dynamic loads
Technician-designer for technological equipment (in the field of cold sheet stamping)
PJSC "Mogilev-Podolsk Instrument-Making Plant”
Промышленность и Производство
2 года 11 месяцев
05.1992 - 04.1995
Design of punching dies for cold sheet stamping.
Parts and assemblies made of sheet metal (cabinets for electrical equipment, elements of metal products from sheet metal for frames made of bent metal for equipment)
Ключевая информация
- International Committee of the Red Cross Delegation
- Span of buildings 12m, 24m. Assessed risks in terms of stability, strength, durability in accordance with international standards IATG 2.10; 05.30; 01.80; The object is located in Moldova
- Drafted tenders, searched for construction companies and teams to perform construction work, as well as search and purchase construction materials. Controlled the quality of the work performed in accordance with the project documentation. The direction is related to the reconstruction of buildings (roofs, walls, internal engineering aspiration and plumbing works and projects).Coordinated construction processes. The object is located in Dnepr
- Calculated and designed a quickly assembled and dismantled building with an internal metal frame according to the customer's requirements at the P (KM) stage.Modular structures with a span of 7.5m. The certificate of design engineer of the category CC3 is available. The object is located in Dnepr
- Performed calculations of warehouse buildings and structures.
Bureau Veritas Ukraine LLC, Kiev
Successful implementation of project expertise of projects:
- Construction of the shopping and entertainment complex "Ashan" in the area of ??113-114 km of the Slavyansk - Donetsk - Mariupol highway in the Gornyatsky district of the city. Makeevka, Donetsk region. II stage of construction
- Construction of a shopping and entertainment center with office premises, parking and guest) parking (1cherga) as part of a multifunctional complex and improvement of the coastal protective strip of the lake on the street. Bazhan and st. Revutsky (near Lake Vyrlitsa) in the Darnytskyi district of Kiev. Engineering preparation of the territory
"State enterprise Design Institute UKRMETROTONNELPROJECT», Kyiv
Objects built in Moscow:
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction. Station "Khodynskoe Pole"
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction.Pavilion No. 1
- The third interchange circuit "Business Center" - "Nizhnyaya Maslovka". I stage of construction.Station "Khoroshevskaya" and transfer at the station "Polezhaevskaya" TCL
Objects built in Kiev:
- Underground metro station "Teremki". Entry group. Work code - VX_5.6_DMS-17.17A_DML-10_S1.2928
- Underground metro station "Teremki". Lobby room. Code of work - Entrance hall No. 2_Gate No. 5.6_ДМС-14_14А_IZM.1
- Underground metro station "Taras Shevchenko".Technological ventilation group. Code of work - ДМП.2_№122
- Underground metro station "Taras Shevchenko". Technological branched ventilation group. Job number -№222
- Bureau Veritas Ukraine LLC, Kiev. Verification of design documentation of the category of complexity CC3. Leroy-Merlin objects, shopping and entertainment center in Lviv
LTD "Arsenal Center ", Kiev
- -Control and coordination of complex drawings during construction as they are received from the designers;
- Drawing up technical specifications based on the customer's requirements;
- Planning the complex of works to be performed, broken down by the dates of the beginning and end of construction;
- Completion of technical documentation;
- Preliminary calculation of grillages for piles (warehouses);
- Checking collection of loads on the frame to determine the support forces on the foundations;
- Conducting technical supervision over complex works.
JSC "Ukrainian Research and Design Institute of Steel Structures named after V. N. Szymanowskiо»
- Development of design documentation for CM (metal structures);
- Distribution of work within the team with subsequent monitoring of work performance;
- Designing the serviceability of warehouse buildings and structures in the seismic zone according to DBN V.2.6-312006 (The calculation takes into account the deformations of structures not only in the horizontal plane, but also in the vertical one);
- Development of non-standard solutions for structures operating on static load (point loads from high-rise towers from 50-250 tons);
- Reinforcement of multi-storey frame structures of more than 4 floors (atypical solutions preventing the operation of nodes on the layering / layering of nodes);
- Development of structures operating on dynamic loads (for escalators, lifts);
- Construction of smoke removal towers, height from 30m-100m;
Учился в 2 заведениях
Vinnytsia Polytechnic University
Civil engineer (specialist)
Kyiv, 2000
Mogilev-Podolsk Assembly College
Builder technician (Junior Specialist)
Mohyliv-Podilskyi, 1992
Владеет языками
Английский
средний
Может проходить собеседование на этом языке
Может проходить собеседование на этом языке
Education at the SpeakUp school. After training level: "INTERMEDIATE LEVEL №7" 2011. Vinnytsia Pol
Курсы, тренинги, сертификаты
Leading construction expert
Passed the exam for the qualification certificate No. 005958, dated 11/17/2020. Category: Leading construction expert. Works (services): Examination of design documentation in terms of ensuring mechanical resistance and stability of construction objects of the class of consequences (responsibility) CC3 (significant consequences)
Civil designer - engineer
Passed the exams for the qualification certificate No. 003455, dated 19.09.2012. Category: Design engineer. Works (services): Civil engineer - designer in terms of ensuring mechanical resistance and stability
General safety courses in construction site
Passed general safety courses, as well as courses with the ability to work at heights, including staying near lifting machines and mechanisms.
Дополнительная информация
Skills certification
PJSC "Mogilev-Podolsk Machine-Building Plant"
Passed certification of a technician-technologist "KM" (metal structures)
1999
Received III-category electric fitter
1992
Mogilev-Podolsk Assembly College
Received III-rank welder
1989
Proficiency skills of professional programs
MS Office.
Graphic programs: AutoCad, SolidWorks, SPDS GraphiCS, AutoCAD Structural Detailing.
Calculation programs: Scad, Lira, Monomakh-Sapr 2013, Fundam 12.4, FOK-PK-2008, FOK-PK-Parus 2006.
Vinnytsia Polytechnic University
Graduated from software-computational-graphic courses on AUTOCAD, ArchiCAD, LIRA, SCAD
2000
Driver's license
Categories A, B, C
Gennadii
Gennadii
Wash Shelter Activity Manager. Project engineer, project Manager, lead project engineer, lead design

сегодня вы можете открыть ещё 0 контактов
Киев
полная занятость
Обновлено 1 месяц назад